Installation of radiators of heating

Installation of system of heating begin with installation of heating devices. However it is possible to begin installation and with assemblage of struts and to start installation of heating devices after the termination of this assemblage. Such sequence has certain advantage. It consists that in case of insufficient accuracy podvodok they can be left without alteration, only having displaced heating radiators on some distance from an axis of window apertures. Section radiators of heating arrive from factory of the manufacturer collected in 7-8 sections. On a place of installation them group so that to receive the quantity of sections provided by the project.

To expansion and curling of nipples radiatornyh sections at their grouping apply radiatornye keys. The key has on the one hand an ear for the handle, and with - other a flat screw-driver of appropriate width. The width should be such that the screw-driver with a small backlash passed through apertures of nipples and rested against their internal ledges.

Grouping of sections and radiators

a Fig. 54. Grouping of sections and heating radiators
And - grab by nipples on dvetri threads of a carving of sections;
- definitive dovorachivanie nipples and joining of sections;
In - connection of the third section;
g - grouping of two radiators; 1 - section; 2 - a nipple; 3 - a lining; 4 - short radiatornyj a key; 5 - lomik; 6 - long radiatornyj a key

At grouping it is necessary or to disconnect a part of sections from a radiator, or to add (fig. 54). In the first case a radiator fix on a workbench and in opened nippelnye apertures, top and bottom, insert on corresponding depth two radiatornyh a key. It is done simultaneously by two workers - keys they develop simultaneously both nipples.

In need of increase in number of sections in a radiator both connected parts of the device stack on a workbench, grease the top and bottom nipples with drying oil, having put on them linings, screw nipples by hand on 1-2 threads of a carving. After that bring to nipples an attached part of a radiator and, operating simultaneously with two keys, wrap nipples in section to the full.

and radiatornye sections have Nipples on the one hand right, and with another - the left carving (fig. 55), therefore it is necessary to rotate a key to the left if curling is made from outside sections with the right carving, and to the right if curling becomes from outside sections with the left carving.

At radiator dismantling arrive on the contrary. The simultaneity of curling specified above or expansion of nipples above also is below necessary to prevent a warp of sections.

the Grouped radiators of heating subject hydraulic to test at the special stand . The radiator by means of the special adaptation is connected to a hydraulic press, filled with water, air simultaneously is issued. The hydraulic press creates necessary pressure (not less than 4 kgs/sm 2 and no more than 8 kgs/sm 2 ). If the leak is not present, i.e. If the arrow of a manometre of a hydraulic press does not fall, the radiator is considered passed test. The leak which has been found out in places of connections, eliminate pulling up of nipples.

Before installation grouped and opressovannyh radiators on walls they are desirable for painting, preliminary progruntovav on all surface.

At installation of radiators under windows it is necessary to adhere to following rules:

the Stopper and a nipple

a Fig. 55. A stopper and a nipple
And - a steel stopper through passage with the largest female thread G 1В; - a nipple; in - podvodka to a radiator; g - a pig-iron stopper through passage with the minimum carving G 1/2В, applied in radiators;
1 - radiator section; 2 - a lining; 3 - a stopper through passage; 4 - consolidation; 5 - a counternut; 6 - a pipe podvodki with the extended carving

  • the device centre should coincide with the window centre, the deviation - no more than 20 mm is supposed;
  • the distance from a floor to a device bottom should be not less than 60 mm (for convenience of cleaning of a floor under the heating device), and from top of the device to podokonnoj boards - not less than 50 mm (that it was possible to remove the heating device for repair, without touching podokonnoj a board);

Installation of pig-iron radiators

a Fig. 56. Installation of pig-iron radiators
And - at a wooden wall; 1 - a lath; 2 - a support;
- at the brick plastered wall; 1 - a window sill; 2 - a niche; 3 - an arm;
In - at a wall of the facilitated design; 1 - an arm with an integral support

  • heating devices establish so that their edges would settle down strictly vertically;
  • in each given premise it is necessary to have all heating devices at one level.

Installation of radiators on arms . The distance from the device to a wall depends on its type and a way of installation of a radiator, and also from, whether the lining of pipes is opened or hidden. On fig. 56 variants of installation of pig-iron radiators are presented.

under arms it is better to apply templates To a marking of apertures. The template will reduce marking time. It can be cut from plywood sheet. The height and width of a template should be slightly more sizes of a radiator. In a template bore through apertures in places of installation of arms. A template establish on a plumb so that its axis of symmetry has coincided with an axis of a window aperture. In the planned apertures in a template drill or punch shljamburom nests for installation of arms.

the Template for adjustment of installation of arms under heating radiators

a Fig. 57. A template for adjustment of installation of arms under heating radiators
1 - a board; 2 - the semicylinder; 3 - an arm; 4 - a nail

Arms of each number - top and bottom - have on one horizontal line perpendicularly to a wall. Quantity of arms accept from calculation that one arm should have on 1 m 2 surfaces of heating of a radiator.
Anyway arms should be not less than three on a radiator - one from above and two from below and not less than two on a ridge pipe. Diameters of nests should be such size that it was possible to enter into them freely an arm and to immure a cement mortal. The arm is entered into a nest on depth not less than 120 mm.

Further apply the second template (fig. 57) to fixing of arms in cement weight. In a place of an exit of an arm from its weight rasklinivajut pieces of armature, a steel sheet or rubble. After hardening of a solution the template acts in film.

Use of a template for fixing of arms relieves of necessity to correct arms after solution hardening.

Variants of installation of radiators on wooden and at the facilitated walls-partitions are shown on fig. 56.